Jump to content



Atlantic Copper, Huelva, Spain

Atlantic Copper S.A./ Huelva, Spain

  • Commissioned: 1996
  • Contract Length: 19 months
  • Type of Plant: Copper smelter, gas cleaning, sulfuric acid plant
  • Rated Production: 
    Smelter: 270 000 tpa new copper
    Refinery:  215 000 tpa cathodes
  • Special Features: Lump sum turn-key; fast-track execution; expansion by 80 % during ongoing operation of existing plant facilities with minimum interruption of production.