Jump to content



Recent paste projects

Outotec's recent paste projects include:

MYRA FALLS, CANADA

Paste Plant, Tailings Disposal (also prepared for a future backfill system)
Application: Copper and zinc

- Basic & detailed engineering of the complete plant
- Project and construction management of the complete project
- Supply & erection of 1 x 25m SUPAFLO® high compression thickener
- Supply of control & automation system

 

GARPENBERG, SWEDEN

 

 

Paste Plant, Tailings Disposal and Backfill System
Application: Zinc and silver

- Feasibility study
- Basic & detailed engineering of the complete plant
- Project planning and construction supervision
- Supply of 1 x 17m SUPAFLO® high compression thickener

 

 

PAJINGO, AUSTRALIA

 

Paste Thickener System
Application
: Gold

- Basic & detailed engineering of 14m paste thickener
- Comprehensive lab and pilot dynamic testwork
- Supply and construct of 1 x 14m SUPAFLO® paste thickener
- Project Planning and Construction Supervision

POGO, ALASKA, USA

 

Paste system
Application:
Gold

- Comprehensive lab and pilot dynamic testwork 
- Supply and commissioning of SUPAFLO® 1 X 10m pre-leach paste thickener and 2 x 7m paste thickeners

 

 

AITIK, SWEDEN

 

Tailings Disposal System
Application: Copper and gold

- Basic & detailed engineering of the complete pumping and distribution system from the 18 Mtpy concentrator
- Project planning and construction supervision
- Total of 28 pumps (2 pump stations), distribution system 40km